Lost Production to Downtime (Inverter)

Lost production to downtime is the lost production when Time-Based System Availability (Inverter) is considered Unavailable. Lost Production is the difference between potential production and actual production. It is possible to configure when Time-based System Availability is unavailable.

Technology

Solar

Equation
Lost_Production_to_Downtime__Inverter__-_Equation.png

Where:

ELPD+

is the Lost Production to Downtime, clamped to the positive part.

ATS

is the Time-Based System Availability (Inverter).

Epotential+

is the potential energy production, clamped to the positive part.

Eactual+

is Energy with fallback, clamped to the positive part.

Pcp

is the Cascading Potential Power - Solar.

T

is the device resolution in hours.

Inputs
Lost_Production_to_Downtime__Inverter__-_Inputs.png
Usage Example

This section will be updated later.