Lost Production Contractual Inverter

This is a lost production signal that accrues lost production during stop events categorized as unavailable. If a stop event occurs with a category that should be contractually available, then no lost production will be accrued.

Technology

Solar

Equation

lost_prod_inv_eq_1.png
lost_prod_eq_2_new.png

PAC = the actual Power AC

T = the device resolution in hours.

Epotential = the Cascading Potential Power

A(t) is the contractual time based availability at time t [0.1]

lost_prod_inv_eq_3.png

Inputs

lost_prod_contractual_inputs.png

Usage example

Image showing correlation between dip in time-based contractual availability and lost production (contractual).

lost_prod_inv_usage.png