Skip to main content

Greenbyte Documentation

IEC Availability

Greenbyte calculates time and production-based availability according to the IEC standards. The signals available according to the norm are:

IEC Time-based Availability
  • Time-based Operational Availability (IEC B.2.2 User’s View)

  • Time-Based Operational Availability Calm (IEC B.2.3 User's View)

  • Time-Based Technical Availability (IEC B.3.2 Manufacturer's View)

  • Time-Based Turbine Operational Availability (IEC B.2.4)

Note

In our calculation for IEC time-based availability, we are referring to the IEC's Committee Draft – IEC 61400-26-1 Technical Specification standards published on 18th February 2010.

IEC Production-based Availability
  • Production-Based System Operational Availability (IEC B.2.2 User's View)

  • Production-Based Technical Availability (IEC B.3.2 Manufacturer's View)

  • Production-Based Turbine Operational Availability (IEC B.2.3 User's View)

Note

In our calculation for IEC production-based availability, we are referring to the IEC's Committee Draft – IEC 61400-26-2 Technical Specification standards published on 13 November 2012.